Start a free trial
Menu

STANAG 4457

STANAG 4457 engineering documentation for multinational joint projects

Engineering and configuration management staff on NATO multinational joint projects, and the defence contractors and procurement authorities who prepare and approve their technical documentation.

STANAG 4457 is the NATO agreement covering AEDP-1, on engineering documentation for multinational joint defence projects. NATO has not released it publicly; this page describes it from the Czech defence standard that implements it.

Edition
1
Published
1998-03-13

NATO has not released this STANAG publicly. It is NATO UNCLASSIFIED, and organisations that need it obtain it through their national standardization authority.

What it is

STANAG 4457 is the NATO Standardization Agreement on engineering documentation in multinational joint projects, covering the publication AEDP-1. Edition 1 was promulgated on 13 March 1998 under NATO's CNAD, AC/327 LCMG, WG/7. NATO has not released STANAG 4457 or AEDP-1 publicly, so this page describes them from a public national implementation, the Czech defence standard ČOS 051660 (1st edition, Prague 2019), which states that it introduces STANAG 4457 edition 1 and AEDP-1 edition 1 into Czech use, and extends the text with most of the requirements of a then-forthcoming new edition of AEDP-1. A national implementation can add to or extend NATO's own text, so treat what follows as the Czech implementation's content, not as NATO's own text.

What the Czech implementation requires across a project's lifecycle

ČOS 051660 gives unified guidance for creating, maintaining, managing and processing changes to the technical documentation of NATO international joint projects, and sets out rules for product documentation at each stage of the project life cycle. It structures that documentation around NATO's Phased Armaments Programming System (PAPS). At project-definition phase (PAPS phase 4) it requires a system specification, built from the NATO Staff Requirement, that forms the Functional Baseline. At design-and-development phase (PAPS phase 5) it requires development specifications, subsystem technical-parameter specifications, interface documentation and special test-equipment specifications, forming what the standard still calls the Development Baseline, now more precisely the Allocated Baseline. At production phase (PAPS phase 6) it requires product specifications, critical-process and critical-material specifications, product drawings, and the associated parts, data, index and wiring lists, forming the Production Baseline.

The standard also sets detailed rules for how a specification is worded (unambiguous language, correct use of shall, should and may, and a ban on vague terms such as and/or, adequate or etc.), for drawing content, numbering and revision marking, and for the order of priority to apply when standards conflict: NATO standardization agreements first, then ISO/IEC standards, then other regional or international standards, then national standards, then national military standards, then industry and project standards.

What the annexes cover

The annexes give the assembly-breakdown scheme from part through subassembly, assembly, subsystem and system; general guidance for writing specifications; the priority order for standards and for conflicting documents; general rules for product drawings, including which revision-mark letters are excluded (I, O, Q, S, X, Z) and how approval is recorded; the ISO/IEC standards to use for drawings, in four parts; a list of restricted materials in four groups, heavy metals, hazardous substances, special-product-category substances and ozone-depleting chemicals; and requirements for preparing and maintaining three-dimensional technical data packages, including seven release levels from research-and-development work in progress through to storage and archiving.

Put STANAG 4457 on a system that keeps the evidence

Documents, training, risks and evidence in one place, with the trail an auditor asks for.

How we help

A supplier bound by STANAG 4457 through a contract holds the obtained text through its national authority. In ComplyTrain you record the requirements that apply to you as your own requirements, give each an owner, and keep the evidence that shows you meet them against each one.

Request access to this standard

Tell us how you need to work with STANAG 4457 and what you need from it. We will come back to you about what ComplyTrain can do.

What ComplyTrain does

One system for the whole compliance programme. Start with the module you need most.

  • Forms & Follow-up

    Collect information the same way every time, and decide in advance what happens next.

  • Controls & Assurance

    Know whether your controls are operating, not just whether a policy says they exist.

  • Project Planner

    Turn the compliance work you already know about into a plan with owners, dependencies and dates.

  • Product Compliance

    Know what you can offer, and hold the evidence behind every configuration you offer it in.

  • Reporting & Analytics

    Eight built-in reports across every module, scheduled, delivered, and filed where the evidence lives.

  • Media Monitoring

    The sector news that matters to your organisation - read and rated by AI, and delivered as a scheduled digest in your own language.

  • Grants & Tenders

    AI reads the tender pack and pulls out the requirements, deadlines and rules - then helps you draft the response from your own approved content, with you reviewing every step.

  • Stakeholder/Vendor Management

    One current register of the suppliers and partners you depend on - each risk-assessed, re-assessing itself on schedule, and wired straight into your risk register.

  • Requirements Management

    See every requirement you face - across every standard, plus your own contracts and policies - traced to the documents, evidence and processes that satisfy it.

  • Risk Management

    Identify, score, treat and review your risks in one place - with AI to help anyone run a proper assessment, and a defensible trail behind every decision.

  • Training Management

    Assign training, prove it was understood, and hold the competence records an auditor asks for.

  • Document Control

    Draft compliance documents with AI, keep every version under control, and export them beautifully branded - all in one place.

  • Quality Management

    Audits, corrective actions, processes and approvals in one quality system, organised around ISO 9001.

Latest from ComplyTrain

Other standards in Life-cycle management and quality assurance

  • AACP-02AACP-02 guidelines for mutual provision of contract audits
  • AAP-20AAP-20 NATO programme management framework
  • AAP-48AAP-48 NATO system life cycle processes
  • ACMP-2000ACMP-2000 policy on configuration management
  • ACMP-2009ACMP-2009 guidance on configuration management
  • ACMP-2100ACMP-2100 configuration management contractual requirements

Compliance work does not have to live in documents and spreadsheets

See ComplyTrain on your own processes in a 30-minute demo, with your quality or compliance lead.