Start a free trial
Menu

STANAG 4575

STANAG 4575 NATO advanced data storage interface (NADSI) for ISR systems

Defence system integrators and equipment suppliers building ISR recorders or ground stations under a contract that invokes STANAG 4575 or the AEDP-06 publication it covers

STANAG 4575 is NATO's agreement committing member nations to implement AEDP-06, the interface requirements for transferring ISR data from removable memory modules to compliant ground stations.

Edition
5
Published
2026-07-14
THIS DOCUMENT Agreement Holds requirements Organisation certificate Product or design assessed STANDARDIZATION AGREEMENT · EDITION 5 · 2026-07-14 STANAG 4575 NATO advanced data storage interface (nadsi) requirements and STANAG 4575 is NATO's agreement committing member nations to implement AEDP-06, the interface requirements for transferring ISR data from removable memory modules to compliant grou. AGREEMENT STANAG 4575 The NATO agreement. The specification is not in this cover. WHERE THE REQUIREMENTS LIVE AEDP-06 AEDP-06 sets NATO's advanced data storage interface (NADSI): the connectors, protocols and encryption-credential handling for downloading data from an ISR aircraft's removable memo. The requirements live in AEDP-06, not in STANAG 4575. Addressed to national authority. Puts AEDP-06 into force. STANAG 4575 names no accreditation, notified-body, government-surveillance or audit scheme for a supplier or product. Binds a nation once ratified. Reaches a supplier when a contract or national instruction names it or the publication it covers. Nobody is certified against this document. Nations report ratification; they do not issue a company certificate.

What it is

STANAG 4575 is the NATO Standardization Agreement covering the NATO Advanced Data Storage Interface (NADSI), currently Edition 5, promulgated 14 July 2026, superseding Edition 4 of 2 December 2014.

A STANAG is not the specification

A STANAG is the agreement by which NATO nations commit to implement a standard, not the technical specification itself. STANAG 4575's own text is short and administrative: an aim, one interoperability requirement, and the ratification and reporting machinery. The interface requirements themselves are specified in a separate publication, AEDP-06 Edition C, which the STANAG names as the standard participating nations "agree to implement." Anyone actually designing, specifying or testing a NADSI-compliant recorder or ground station needs AEDP-06's own text, not this cover agreement.

What it commits nations to

The stated interoperability requirement is "to promote interoperability among North Atlantic Treaty Organization (NATO) Intelligence, Surveillance, and Reconnaissance (ISR) Systems for the download of data stored on Removable Memory Modules (RMMs) and transferred to compliant Ground Stations." The agreement is implemented "when collected intelligence data is transferred from any compliant ISR data acquisition recorder to a compliant ground station via the NATO Advanced Data Storage Interface (NADSI) in accordance with the requirements specified in AEDP-06" - an operational trigger, not a design-stage deadline, which means the interface work has to be finished well before a mission generates data to move.

Who it binds, and how

STANAG 4575 binds nations, not suppliers. It is effective "upon receipt for use by the participating nations and NATO bodies," and it becomes binding on a given nation through ratification, which NATO records in the NATO Standardization Documents Database (NSDD). Allied nations and NATO bodies carry a reporting duty once implemented; partner nations are only "invited to provide their implementation details through the electronic reporting tool (e-Reporting)." A supplier meets STANAG 4575, or the AEDP-06 requirements it covers, only where a contract or tender says so - the document itself sets no obligation reaching a supplier directly, and it names no NATO-wide effective date (its own "NATO EFFECTIVE DATE (NED)" field reads "Not applicable").

How it's evaluated

STANAG 4575 describes no certification scheme and no audit. What it describes is nations reporting their ratification and implementation status to NATO for the record: "National responses are recorded in the NATO Standardization Documents Database (NSDD)." Nobody is "STANAG 4575 certified," and the document never uses that language. It also does not describe how an individual recorder or ground station is tested or verified for NADSI compliance; that detail, if the AEDP-06 publication provides it, is not part of this STANAG.

Standards it references

STANAG 4575 covers AEDP-06, the publication that carries the actual NADSI interface requirements. Reviews of STANAG 4575 itself run under AAP-03. The document also points to Chapter 1, Paragraph 1.3 of AEDP-06 for a further list of related documents, which is not part of this STANAG's own text.

Put STANAG 4575 on a system that keeps the evidence

Documents, training, risks and evidence in one place, with the trail an auditor asks for.

How we help

STANAG 4575 and the AEDP-06 interface requirements it covers are implemented in systems engineering and ISR data-handling procedures, not in a compliance platform: an engineer builds a NADSI-compliant recorder or ground station, and an operations team follows the procedures for handling and transferring the collected intelligence data.

What ComplyTrain does for that kind of work generally is give a defence supplier one auditable place to hold the implementation and data-handling procedures, the training records for the people operating that equipment, and the evidence trail - non-conformances, corrective actions, document control - that a customer's quality representative or a government surveillance visit will ask to see.

ComplyTrain does not design a NADSI interface, build or test a compliant recorder or ground station, or determine whether a system meets AEDP-06's requirements. That is systems engineering work, carried out against AEDP-06's own text and the contract's technical requirements.

Which STANAGs and Allied Publications actually apply to a given ISR programme is set by the contract and the customer's quality clause, not by us. Browse the explorer to see what sits alongside STANAG 4575 and AEDP-06, and talk to us about the evidence trail once you know which ones are in your contract.

Request access to this standard

Tell us how you need to work with STANAG 4575 and what you need from it. We will come back to you about what ComplyTrain can do.

Questions

Is STANAG 4575 mandatory?

Only where a nation has ratified and implemented it, and it reaches a supplier only where a contract or tender invokes it. The STANAG's own "NATO EFFECTIVE DATE (NED)" field reads "Not applicable," so there is no blanket start date to point to.

What is the difference between STANAG 4575 and AEDP-06?

STANAG 4575 is the NATO ratification agreement; AEDP-06 Edition C is the publication that actually specifies the NATO Advanced Data Storage Interface requirements. Ratifying STANAG 4575 is how a nation commits to implement AEDP-06.

Can a company be certified to STANAG 4575?

No. STANAG 4575 describes nations ratifying and reporting implementation to NATO, recorded in the NATO Standardization Documents Database. It names no certification or audit scheme for a supplier or a product.

What changed between Edition 4 and Edition 5 of STANAG 4575?

The document states that this edition supersedes "STANAG 4575, Edition 4, dated 2 December 2014," but it does not itself describe what changed between the two editions.

What are Removable Memory Modules (RMMs)?

STANAG 4575 names them as the media the NADSI interface downloads data from, but does not itself define or specify them beyond that; the technical detail sits in AEDP-06.

What ComplyTrain does

One system for the whole compliance programme. Start with the module you need most.

  • Forms & Follow-up

    Collect information the same way every time, and decide in advance what happens next.

  • Controls & Assurance

    Know whether your controls are operating, not just whether a policy says they exist.

  • Project Planner

    Turn the compliance work you already know about into a plan with owners, dependencies and dates.

  • Product Compliance

    Know what you can offer, and hold the evidence behind every configuration you offer it in.

  • Reporting & Analytics

    Eight built-in reports across every module, scheduled, delivered, and filed where the evidence lives.

  • Media Monitoring

    The sector news that matters to your organisation - read and rated by AI, and delivered as a scheduled digest in your own language.

  • Grants & Tenders

    AI reads the tender pack and pulls out the requirements, deadlines and rules - then helps you draft the response from your own approved content, with you reviewing every step.

  • Stakeholder/Vendor Management

    One current register of the suppliers and partners you depend on - each risk-assessed, re-assessing itself on schedule, and wired straight into your risk register.

  • Requirements Management

    See every requirement you face - across every standard, plus your own contracts and policies - traced to the documents, evidence and processes that satisfy it.

  • Risk Management

    Identify, score, treat and review your risks in one place - with AI to help anyone run a proper assessment, and a defensible trail behind every decision.

  • Training Management

    Assign training, prove it was understood, and hold the competence records an auditor asks for.

  • Document Control

    Draft compliance documents with AI, keep every version under control, and export them beautifully branded - all in one place.

  • Quality Management

    Audits, corrective actions, processes and approvals in one quality system, organised around ISO 9001.

Latest from ComplyTrain

  • Compliance in medical device manufacturing: an overview

    Medical device manufacturers operate under more regulatory pressure than almost any other sector outside pharmaceuticals. The rules govern how you design a device, how you make it, how you track it after it ships, and how you respond when something goes wrong.

Other standards in Air armaments

  • AEDP-02AEDP-02 NATO ISR interoperability architecture
  • AEDP-03AEDP-03 sanitization guidance for advanced data storage memory
  • AEDP-05AEDP-05 implementation guide for the NATO ISR library interface
  • AEDP-06AEDP-06 NATO advanced data storage interface (NADSI)
  • AEDP-12AEDP-12 NATO ISR tracking data standard
  • AEDP-17AEDP-17 NATO standard ISR library interface

Compliance work does not have to live in documents and spreadsheets

See ComplyTrain on your own processes in a 30-minute demo, with your quality or compliance lead.